Following activity shall be performing during the Installation qualification of but not limited to.
General test
o Availability of IQ test report verification
o Standard operating procedure verification
Automated control
o Verification of Human Machine Interface
o I/O status verification
o Verification of Alarms & Interlocks
o User Access test
o Verification of Configurable parameter
o Verification of power failure
o Real clock verification
o Verification of interface and communication
o Verification of noise level
Specific operational test
o
Verification of measures identified during risk analysis
o
Training record verification
Deviation and corrective action verification